Thursday, March 13, 2014
Friday, March 7, 2014
The Sheetrocking has Begun
The sheetrocking is nearly done and it makes a huge difference. We finally got a temporary heater installed on a waggon in the shop with its duct running through the hall and into the stairwell. It uses the propane from our 500 gallon emergency heat tank that can heat the house if power is out and we are on battery and solar power. Propane is also used for our cooking.
Two walls of the shop are plywood so I can hang stuff anywhere, and we looked at 3/16 wire and Ipe handrail for the railings around the deck, master bedroom balcony and roofwalk.
The living room from the balcony |
Balcony and Living Room wall |
Stairs up to the Roof Walk |
Master Bedroom |
Dressing Room with skylight |
Walking out of the Master Bedroom toward the Balcony |
Main floor Bedroom |
Stairs from Main Floor to Upper Floor from Deck |
Deck showing the Ipe and Railings |
Railing with wires and Ipe handrail |
Shop with plywood wall and temporary heater in middle |
Other view of Ship showing the long shelf and 2 sections of the sewing table that will be underneath it. |
Shop showing Plywood walls from under shelf with sewing tables in foreground. |
Hallway from shop with temporary heating duct sending heat up the stairs with the downstairs bedroom at the end of the hall. |
Lower bedroom showing hallway, closet and bathroom doors |
Wednesday, March 5, 2014
Gray Owl now on Google Maps
Here is the link to the picture of Gray Owl in google maps. It was taken after the concrete walls were cast and the power was put in, but before the floor was poured. You can tell by the shadow of the wall where you can see the doors and windows in the west basement wall.