The road building begins |
![]() |
This machine cut down and ground up the trees and roots in a couple of swift movements |
![]() |
The soil had to be removed about 2' deep and replaced with stone |
![]() |
The beginning of the basement |
![]() |
We harvested lots of rocks, but didn't find any gold |
![]() |
Forming the basement |
![]() |
A pump truck for the concrete walls |
![]() |
The walls are ready for the floor to be poured |
![]() |
The beams are ready for the steel decking |
![]() |
Ready to pour the main floor |
![]() |
The steel support structure is going up |
![]() |
The framing begins |
![]() |
The large roof beams are being set on the steel structure |
![]() |
The roof starts out with 2x12's |
![]() |
Then plywood decking, 2x4's foam and finally metal roofing |
![]() |
After dense pack cellulose insulation the sheet rock and primer |
![]() |
The finished house at night |
![]() |
The patio to the main entrance |
![]() |
The master bathroom |
![]() |
The office in the loft over the kitchen |
![]() |
The master bedroom |
![]() |
The living room as viewed from the loft |
![]() |
the living room |
![]() |
The entrance hallway |
![]() |
The skylight from the roof walk balcony |
![]() |
View from the top of the stairs |
![]() |
The living room |
![]() |
The Kitchen |
![]() |
The main floor bedroom |
![]() |
The main floor bathroom |
![]() |
Tile Details |
![]() |
Tile Details |
![]() |
Tile Details |
![]() |
Tile Details |
![]() |
Tile Details |
![]() |
Tile Details |
![]() |
Tile Details |
![]() |
The lower floor bedroom |
![]() |
Lower floor bathroom |
![]() |
The lower floor bathroom |
![]() |
Lower floor bathroom |
![]() |
The shop looking in |
![]() |
The mechanical room - Electrical panels in the foreground, then the solar panel controllers and the backup batteries |
![]() |
The mechanical room air handlers |
![]() |
The shop looking out |